Posted on 05/7/21 in Case Studies
A new build London hotel in the bustling Shoreditch area of London gets the basement BS8102 treatment.
A new build London Hotel in the bustling Shoreditch area of London gets the basement BS8102 treatment, Cavity drain membranes and waterproof concrete have been used to form part of a BS8102 designed scheme.
Wykamol was asked to attend the site to help design a scheme to waterproof this new build space which was going to form part of the new hotel for a restaurant and office areas.
Having looked at the scheme Wykamol was able to send over a design scheme, as well as 3D specialist drawings to the Wykamol, registered installer Advance Property Preservation.
Managing director Simon Wooton asked Wykamol to help so our BBA-approved products would be passed by the engineers and architects, working at the design stage.
Wykamol are able to help look at the plans and to help to create a robust basement waterproofing scheme.
When dealing with water from the ground care must be taken to ensure dual waterproofing schemes can work together to give the clients a dry space that can be used without any difficulty of damage to the system.
In this instance, our Type C cavity drain membranes including our high visibility yellow membranes were used, these membranes not only act as a waterproofing product but are also passed as a ground gas membrane against Radon.
Make sure you contact the team at Wykamol to help on your next project on 0845 400 6666